At PLP we don’t want to be “just another supplier” but rather we want to work in partnership with our customers. We provide solutions; not just product, and work with Engineering Consultants, Utility Engineers, Electrical Design Consultants to deliver the best possible design for each specific Substation fittings application and bus work.
Solutions
In recent years there has been a push from our customers to work on solutions that reduce, as much as possible, the requirement for onsite welding. Given busbar spans can be over 30 meters it is not always possible to eliminate all welding on site, but by working closely with our clients we can work on solutions that keep this number as low as possible. PLP has recently delivered busbars to major projects around the country that are up to 25 meters long as a fully fabricated busbar system. The busbars are supplied pre-welded with the required end palms, flags, end caps, earthing stirrups and damping cable installed. The whole system is loaded on to an extendable semi-trailer and can be transported on to the site with the help of pilot vehicles.