Glencore’s former CSA Mine at Cobar, in regional New South Wales, is one of Australia’s highest grade copper mines. The underground mine, which operates 24/7, produces about 50,000 tons of copper each year. The metal is mined and processed onsite and then transported to the Port of Newcastle for export to smelters in Asia.
CSA Mine currently uses diesel loaders as part of its excavation operations in the mine. These loaders haul around 50,000 tons of copper every year, but produce heat, noise, moisture and emissions, so the 2,000m deep mine must be kept well ventilated. Last year, CSA Mine invested in its first battery electric loader – the Epiroc ST14 – which is more than 2.5m tall and capable of carrying up to 14 tons of copper each.